Construction of a logistics warehouse building on 15.010,00 m² of land, with a ground session of 7.800,00 m² and a total construction area of 18.308,00 m².
(18.000,00m³ ready-mixed concrete, 2.520,00 tons of rebar, 38.000,00m² formwork, 700,00 tons of steel fabrication, 25.000,00m² panel will be used in this project).