In order to ensure the connection of EvyapPort facilities to the D-100 highway via the railway, the construction of the 330.00 m long, 11.10 m wide, H30-324 load class bridge with a total of 3,663.00 m² cast-in-place slab area with bored piles and prestressed girder system was completed by us.