EVYAPPORT FINGER PIER PROJECT

Projemiz Hakkında

Construction of 200m long, 15m wide piled pier; 2 80m long, 20m wide piled berths; 2 20m long, 30m wide piled Ro-Ro ramps, electrical and plumbing ducts and 12000 m² backyard container stacking area

Construction of 200m long, 15m wide piled pier; 2 80m long, 20m wide piled berths; 2 20m long, 30m wide piled Ro-Ro ramps, electrical and plumbing ducts and 12000 m² backyard container stacking area