Safi Port Derince Port Construction 2nd Warehouse Construction within the Existing Port 4.000,00m².
(In this Project, 8.000,00m³ Excavation, 10.000,00Ton Backfill, 51 pcs Ø800mm * 28,00m Bored Piles, 3.500,00m³ Ready-Mixed Concrete, 250,00Ton Rebar, 8.000,00m² Formwork, 5.000,00m² Field Concrete, 220,00Ton Steel Fabrication, 3.260,00m² Roof Panel Covering, 360,00m² Facade Panel).